To better understand the “Risk” in any area, it is necessary to be aware of the various terms used and what they mean.

The Risk Assessment process used in Derbyshire is taken from the Statutory Guidance “Emergency Preparedness” which supports the Civil Contingencies Act 2004. Additional “restricted” guidance is issued annually by the Government.

Given below is a summary of useful definitions taken from this Guidance and other supporting documentation and explains the current process in more detail.

Risk – is defined as the product of the likelihood and impact of a given hazard or threat.

Hazard – for the purpose of this process describes the potential to cause harm by something “accidental or naturally occurring”.

Threat – for the purpose of this process describes the potential to cause harm as a result of intentional malicious actions, and includes terrorism.

Impact – is a measure of the severity of the potential harm caused by the hazard or threat. In this Risk Assessment process the impacts on health, the economy, the environment and social impacts are considered.

Each impact is given a rating of 1 to 5, described as:

1 = Limited
2 = Minor
3 = Moderate
4 = Significant
5 = Catastrophic

Likelihood – is the probability of an incident related to a hazard or threat, occurring over the next five years. The likelihood is given a rating of 1 to 5, described as:

1 = Low
2 = Medium Low
3 = Medium
4 = Medium High
5 = High

Further Information

The impact scoring scale, explanation of the categories of impact and the likelihood scoring scale can be found here in more detailed tables.

Definitions of Risk Ratings

Very High (VH) Risk – these are classed as primary or critical risks requiring immediate and ongoing attention. They may have a high or low likelihood of occurrence, but their potential consequences are such that they must be treated as a high priority. This may mean that strategies should be developed to reduce or eliminate the risks, but also that mitigation in the form of (multi-agency) planning, exercising and training for these hazards should be put in place and the risk monitored on a regular frequency. Consideration should be given to planning being specific to the risk rather than generic.

High (H) Risk – these risks are classed as significant. They may have a high or low likelihood of occurrence, but their potential consequences are sufficiently serious to warrant appropriate consideration after those risks classed as “very high”. Consideration should be given to the development of strategies to reduce or eliminate the risks, but also mitigation in the form of at least (multi-agency) generic planning, exercising and training should be put in place and the risk monitored on a regular frequency.

Medium (M) Risk – these risks are less significant but may cause upset and inconvenience in the short term. These risks should be monitored to ensure that they are being appropriately managed and consideration given to their being managed under generic emergency planning arrangements.

Low (L) Risk – these risks are both unlikely to occur and not significant in their impact. They should be managed using normal or generic planning arrangements and require minimal monitoring and control unless subsequent risk assessments show a substantial change, prompting a move to another risk category.

Priority for Action

The statutory Guidance, Emergency Preparedness, states that “the Local Resilience Forum should prioritise risk reduction measures in accordance with the level of risk and the gaps in the capabilities required to respond to those risks”. The “priority for action” or “risk priority” rating as recommended in the additional Guidance on local risk assessment, issued on 22 September 2005 should be on a scale of 1-5 with 1 as the lowest priority and 5 as the highest.

Given below are the definitions (developed and agreed locally) of each “priority for action” rating, shown on the Derbyshire Risk Treatment Plan:

1 = No risk treatment required currently but subject to ongoing risk assessment and periodic review.
2 = Limited risk treatment required. Confirm adequacy of existing generic emergency planning arrangements.
3 = Risk manageable within generic emergency plans. To be incorporated into generic awareness raising for all Category 1 responders.
4 = Further actions required, may include preparation of specific emergency plans or integration into existing protocols and training.
5 = High priority for ongoing attention and preparation of specific emergency plans. Examine possibility of measures to reduce the overall level of risk.

NB: The Derbyshire Local Resilience Forum approves a “Risk Treatment Plan” every two years related to our “Very High and High” risks.

This outlines our “Priorities for Action” and also indicates the risk priority ratings. Links to the current 2010/11 Risk Treatment Plan can be found on the Community Risk Registers.

If you want to Know More

Should you have any questions about the risk assessment process or the continuing work of the Risk Assessment Working Group:

Contact: Nick Elliott
Tel: 01629 538361

go back to top


Web design by Rock Kitchen Harris